Font Size: a A A

Quality Management Of Trunk-liner Metallic Material Project

Posted on:2013-03-06Degree:MasterType:Thesis
Country:ChinaCandidate:H Q ZhangFull Text:PDF
GTID:2249330362967509Subject:Project management
Abstract/Summary:PDF Full Text Request
Large passenger aircraft project is a national industry, science and technology leveland the embodiment of comprehensive strength, the industry chain length, width, jointeffect focusing strong, can drive the new material, the modern manufacturing,advanced power, electronic information, automatic control, computers and other fieldsof key technologies of the group breakthroughs. Can pull many high technologyindustry development; Will also drive the fluid mechanics, solid mechanics, and manyother basic subject of great progress, and will be comprehensive, greatly improve thelevel of science and technology of China, to enhance China’s comprehensive nationalstrength, science and technology strength and international competitiveness, China’searly modernization has very important significance.This article in view of the large aircraft metal material test project qualitymanagement exists ability weak, the talented person troop younger, the lack of qualitymanagement experience, old equipment, test personnel to understanding of the normsof the standard does not agree, test report lacking integrity, utilizing the theoryconstruction method PDCA metal material test project WBS, formulate detailedquality plan, optimize the metal material experiment project process and method,strengthen quality control and standardization, and puts forward the qualityimprovement tools and method, using the causality diagram from personnel, materials,equipment, the method, the environment and so on to analyze the research, use controlchart of the test process control, and further perfect the non-conformity correctivemeasures. Through the research of application reduced because of factors leading tothe original recording of the personnel not complete, test procedures not perfect leadto the original record loss, equipment failure cause abnormal phenomenon of the test,and greatly improve the accuracy of the results of complete.
Keywords/Search Tags:quality management, quality control, quality improvement, PDCA
PDF Full Text Request
Related items