The Research And Implementation Of Metering Integrated System Of Date Exchange Platform

Posted on:2014-01-19Degree:MasterType:Thesis
Country:ChinaCandidate:L F LiuFull Text:PDF
GTID:2248330395996786Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Power measurement centre is to improve the inspection efficiency of electric power device,reduce labor intensity of labors, and solve human error appeared in test. According to guidance ofoverall construction of measuring center, implement the design requirements of applyingstandardization of marketing business. Establish the integrated measurement system of themeasuring center.Integrated measurement system uses platform system of PNS technology co., LTD., connectssingle watt-hour meter checking flow line, three-phase electric energy meter checking flow line,load control equipment checking flow line, concentrated copy equipment checking flow line andstereoscopic warehouse to play into the function of production scheduling from the storehouse toflow line. Improve the efficiency of checking flow line, and set a test scheduling benchmark in thepower industry, which meet the needs of various businesses well.Power companies invested heavily in information technology to make its operational modechange. The previous single artificial way of working is gradually replaced by computer-automatedprocesses. This feature is particularly prominent in those enterprises of automatic production.Because of the limitations of design, manpower, economy, it is impossible to concentrate allresources. It is an urgent demand for these companies to build bridges between information units,making them communicate with each other between the unit and the unit and share resources. Thelong period of software development also leads to some companies only using part of the functionsin a period. And then because of the subsequent cost of developing components, the componentsmay cause some differences with the original system. Therefore, there will be problems, such aspoor direct exchange of data between the old and new systems. In order to achieve data exchangewith SG186marketing system of existing platforms, develop the data exchange platform ofintegrated measurement system.In this article, the author describes the research and implementation of constructing dataexchange platform in the power industry. Analyze the method of implementation, and finally takethe method of setting up intermediate switching database. In essence, the intermediate database is atemporary storage under the condition of indirect exchange data between an integrated platformsystem and SG186system. Intermediate database plays a role as a bridge. Of course, there are many ways of bridging, and you can use database synchronization software, WEB Services, etc. torealize. But the projects will encounter different cases in the process of implementation, andsometimes some common ways cannot meet our needs. Therefore, we need to design realizationmethods according to the actual conditions.In this paper, the author presents implementation methods, implement foundation ofsoftware and hardware, design thought and key technologies during the development process.The author hopes that it can provide some reference for implementers to exchange data onsystem platform in the electricity industry.
Keywords/Search Tags:Data Exchange Platform, C#, Marketing system, Oracle
PDF Full Text Request
Related items