Font Size: a A A

The Civil Aviation Atc In Guizhou Branch Of The Design And Implementation Of Equipment Information Management System

Posted on:2013-02-25Degree:MasterType:Thesis
Country:ChinaCandidate:Z ZhengFull Text:PDF
GTID:2248330395967101Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Accompanied the rapid development of the civil aviation industry, air traffic management face to highlight the growing pressure in recent years, the Civil Aviation Guizhou branch control of the air traffic control area traffic is increasing rapidly, and put forward higher requirements for technical support work of the security department of the equipment, the current air traffic control equipmentand social security departments have generally adopted the the paper equipment operation and maintenance management mod. less efficient. in order to effectively improve the management of this type of backward mode, it is necessary to introduce a new era of state-of-the-art information management tools, electronic equipment operation and maintenance management systemupdates.Papers on equipment operation and maintenance management of the situation facing the Civil Aviation Guizhou empty tube Branch-depth analysis, equipment operation and maintenance of information technology needs for the current and the current paper-based operation and maintenance of the presence of defects and problems, propose and design a advanced electronic equipment operation and maintenance management system:paper presents the final design of the system’s goal is to establish a paperless equipment operation and maintenance management system, and operation and maintenance system detailed needs analysis, business requirements, functional requirements, non-functional requirements, non-functional requirements analysis, given the system run the corresponding business process diagrams, use case diagrams and conceptual class diagram and detailed description of each use case; aspects of the system design, the paper module design function module function block diagram, class diagram, sequence diagram and flowchart detail, detailed design and interface and final entity class diagram in the form of a detailed design of the database; papers last research the contents of a summary, my main job is introduced, and point out the development direction of the papers of the system late, and further work prospects.
Keywords/Search Tags:air traffic management, equipment operation and maintenance management, the UML, data modeling
PDF Full Text Request
Related items