Font Size: a A A

The Planning Scheme Of CMTJ’s TD Network RNC Replacement And Installation Project

Posted on:2013-09-20Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2248330392953258Subject:Electronics and Communications Engineering
Abstract/Summary:PDF Full Text Request
At the beginning of2007,CMTJ is lucky as the first city of TD-SCDMAnetwork’s construction.In the early stage,mobile phone and equipment is not verygood,they had many hitchs.With the construction step by step,the manufacturer haveresearch the bigger and stable equipment.According to the needs ofdevelopment,CMTJ plans to begin a project of replacing the old equipment.Thisthesis is the scheme and application of CMTJ’s TD network RNC replacement andinstallation.Firstly,this thesis introduces the basic situation and the composition of wirelessnetwork of CMTJ.Giving the corresponding design parameters and indexes,Afterly,Introducing the specifications and parameters of new equipment. Be aimed at actualsituation, analysis of the current situation of the network from IU-CS,IU-PS,IU-b andOMC-R.Then we obtain the main content and scale of investment of the replaceplan.And we have a detailed analysis about the step. On the basis of it,we giving theaccess demands about the power, transmission,switch.finally,giving the otherdemands about the synchronized signal, fire control, dustproof, energyconservation,environmental protection.This thesis can start form the situation of network.Make a clear replacement planabout the old equipment.It has guiding significance On the latter part of the actualproject and has a good supporting role to improve network quality of TD, networkenvironment, the competition ability of network.
Keywords/Search Tags:TD-SCDMA, RNC, replace, Iu-CS, Iu-PS, Iu-b
PDF Full Text Request
Related items