Zhong Tian Shan Tunnel Rapid Construction Of Comprehensive Technical Research

Posted on:2014-01-29Degree:MasterType:Thesis
Country:ChinaCandidate:K F YouFull Text:PDF
GTID:2232330398476067Subject:Bridge and tunnel project
Abstract/Summary:PDF Full Text Request
The use of TBM can clearly shorten the duration comparing with the drilling and blasting method. Open TBM has10years of experience in construction, The serious equipment aging, low utilization of equipment, tool wear, increased damage and difficulty in cave repair result in the increase of cost and duration lagging.This paper is based on the project of Zhong Tianshan tunnel in southern Xinjiang. Zhong Tianshan tunnel is the longest single head Boring in domestic TBM engineers and it faced the problems, such as duration pressure, the complex geological conditions, the difficult y in construction and serious equipment aging. So research on fast construction of TBM makes sense. Statistics, laboratory test and numerical simulation is calculated as the main means of research, compared with each other and confirmed the main content. Mainly has the following contents.(1)Explain the advantages of TBM excavation and secondary lining simultaneous construction:reduce the exposure time of the surrounding rock, secondary lining in a timely keep up, ensure the stability of the tunnel hole body, greatly shorten the construction period, Improve the mechanical utilization, saving construction costs.(2)Lining Template trolley and Facilities for the design, focus on how to reduce or avoid mutual interference constraints. Rapidly achieve the conversion of cross-operation process,Template trolley fast stripping positioning,The concreting and tunnel mucking synchronization processes.(3) Analysis the stress of the template trolley designed specifically for Zhongtianshan Tunnel, draw their cross-sectional、stiffness are meet the design requirements, And the overall is also meet stability requirements. Therefore, this template is safe in the process of construction operations.(4)The TBM in the granite, keratophyres, metamorphic sandstone geological conditions rapid excavation technology research. In fault fracture zone and intensive joints zone, TBM through comprehensive advanced geological prediction,Adjust the TBM parameters, Grouting reinforcement, Collapse processing, achieve rapid construction(5) The ring material analysis and technical parameters research, The choice of the ring gear repair process, main bearing ring gear repair method research.
Keywords/Search Tags:TBM, The secondary1ining synchronization job, Template trolley, Rapidconstruction, Repair of the ring gear
PDF Full Text Request
Related items