Font Size: a A A

Research On Procedure Control Of Ship Repairing And Building And Management System Building

Posted on:2013-08-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y XiaoFull Text:PDF
GTID:2232330374975847Subject:Naval Architecture and Marine Engineering
Abstract/Summary:PDF Full Text Request
During2011, due to the continually world economic crisis and low requirement of themarine industry all over the world, China marine industry is affected strongly. It is a greatchallenge in environment of new ship contract drop down substantially, the main economicobjects are decrease strongly. In order to minimise the affection of the external fact, all theshipyards are focus on internal management in order to decrease the expense during thenew construction. It is including define the object of sub-construction department, optimizethe technological process and management, and harmonize the process betweendepartment.At the moment, many shipyards construct their management according to ISO9001,14001and OHSAS18001, specially in area of marine and off shore construction, forexample LNG carrier, FPSO tanker and oil digger. So it can meet the basis health and saferequirement during tender.This article is the guidance of the process management base on COSCO (Guangdong)shipyard management system. The shipyard is deal with both marine existing repairs andnew construction, also with off-shore product new construction. The article will analysisthe function of the manage system in order to decrease the production expense, especiallyin the circumstance of the economic crisis, low requirement of the market. The article isalso the guidance for yards or manufactures which are deals with the similar jobundertaking.This article includes4parts as following. First, analysis the condition of right nowmarine market circumstance, the purpose of construct management system and thenecessary of optimize the management system. Second, analysis the methods of the processmanagement and analysis the element affection individually. Third, internal audit themanagement system of the methods, procedure, key point and the process, and thenconstruct a steady process management system. Forth, analysis the key issues duringconstruction and manage the system.
Keywords/Search Tags:Optimize management, ISO, Procedure optimize, Management system
PDF Full Text Request
Related items