There is a lot of production scale, the complexity of the internal transport in thesteel enterprises.In the planning and construction phase,the intraplant logistics andGeneral Layout Design is not harmonious, the logistics cost is very high,Because of thelack of the logistics of the macro analysis.Therefore, to increase the pre-productionlogistics analysis in the planning, can contribute to the rationalization of the generallayout design fundamentally, help reduce operating costs, improve productionefficiency.This study given a reasonable approach to the design optimization of the generallayout of the iron and steel enterprises which based on the analysis of general planprogram and production process data,starting from the concept of production logisticsand general layout design, detailed analysis of the logistics of iron and steel productionAnd traffic conditions,discussion of production logistics and general layout design of awide range of contactin the prophase of planning and designing. In order to introduceslogistics analysis to general layout design and guide it optimization, to study therelationship between the production logistics and general layout of the whole plantdesign from a macro level, find the law through the analysis of both.It is of majorimmediate significance to make the general layout design and production logistics to amore coordinated more harmonious by analyzing the actual case that combinationresearch and projects.In this paper,use qualitative analysis, macroeconomic analysis and quantitativecalculation method. Analysis includes:First of all,Through the production process tocalculate the whole plant logistics table,Flow Distribution and model split;Secondly,study steel production and logistics and general layout intrinsicallylinked,study the relationship between Production logistics volumeã€distance and modeof transport,Study the fit between Production logistics and factory road networkstructure,On an optimization study between General layout, mode of transport and roadnetwork structure;Finally, in order to provide the general layout design reference byanalyzing the general layout, mode of transport and road network structureoptimization,according to process calculation its logistics table that300tons of steelprojects in a steel company case. |