This article make requirement analysis of course schedule's arrangement, and make explanation of whole structure of system. According to the manual requirement of arrange course schedule in Jinan vocational college, the author designed automatic adapted algorithm.The algorithm based on priority, introduced the design and implement of the system. The design and implement of the data-base, and the design of query and report in detail. The article showed some originalities in flexible setting of time mode, the calculation of priority, the portioning of equivalent, etc, and finally implemented automatic course scheduling. |