Font Size: a A A

Research And Analysis On The Management System Of National Fund Project In Baoshan City

Posted on:2016-06-07Degree:MasterType:Thesis
Country:ChinaCandidate:Z Z ChenFull Text:PDF
GTID:2208330470956051Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Party and the country in order to accelerate the development of ethnic minorities and minority areas, ethnic minority development funding increases every year, funds management development for ethnic minorities, require the use of more and more clear and specific, increasingly onerous task of money management. Only continue to explore and strengthen the standardization and institutionalization of scientific management, the formation of an effective mechanism for proper management and use of minority development funds, in order to continuously improve our management capacity. Due to wide areas inhabited by ethnic minorities and ethnic point of multi-faceted, high poverty face, deep poverty, the need to address the issue more, in order to better use of limited funding arrangements, to arrange financing for development projects in the minority as a working SNC important part of the project as the implementation arrangements, safeguard the vital interests of minorities, practicing mass line and mass viewpoint of a concrete manifestation, and practical, painstaking work Minority development Fund project management.The paper introduces the research background Baoshan City National capital project management system, project significance and current research and application of, clearly the content and the main thesis of the work; in business analysis, the thesis of the system problems, the organization, the original there are business processes are analyzed, given after the transformation of business processes; in functional analysis, the paper through the data flow analysis and data dictionary, a clear function of the system, given the system’s overall functional architecture and functional modules structure, including national capital project management, project reporting national capital, national capital project review, the national capital project budget, the national capital project inquiries and other functional modules; in the data analysis, the paper each function of the system need to be addressed by the data were analyzed given the ER diagram, build a database table structure; Finally, the paper did research and analysis are summarized, and further work is prospected.
Keywords/Search Tags:Information System, FunctionModelling, Database Modelling, FundingProject
PDF Full Text Request
Related items