Font Size: a A A

Chengdu Sales Department, One South Of Hx Securities Companies Risk Management Of Computer Room Project

Posted on:2010-10-30Degree:MasterType:Thesis
Country:ChinaCandidate:B C WangFull Text:PDF
GTID:2199360308465989Subject:Project management
Abstract/Summary:PDF Full Text Request
Nowadays, security industrial has being passed 19 years in China, in this course, information techniques applying comes into existence, from simpleness to miscellaneous, computer techniques and communication techniques have got a worldwide exertion. Information system's adoption, greatly improves the whole security markets'operation efficiency. As same as other industrials, the conditions and potential aftermaths that a great information technology adoption must own requests an information system must have high dependability and low risky, therefore, construction of security information system gets a higher and higher demand. Combine with a idiographic conditions, security business office as a security form's basic business site, need some postulates such as stable running equipments, safety operating environment etc. This article bases a background that HX Securities RenNan Office will build a new business site due to the office's remove, a new machinery room must be rebuilt, then applies related knowledge of Risk Management of management science, to analyzes stages of the machinery room's construction which regards it as a project risk management, which contains project risk planning, project risk discernment, project risk response, including all functional units designing as physical environment, network structure, system equipment, specific applying , and computer hardware sub-system, software sub-system, machinery room exchange equipment, comprehensive wiring system, communication system, satellite sub-system, power & UPS sub-system, security monitoring sub-system, fire controlling sub-system, air conditioning sub-system, anti-lightening sub-system, which covers conduction of technology documents related to risk management in which equipment manage, technique manage contains, it's also a detail description based on the author's project experience which combined with the author's daily working accumulation , especially in the part of risk management.The paper focuses the analysis on the construction of machinery room of a security company, which comes from a view of project management. As it covers all sub-systems, so it can be regarded as a template which a security business office's builds an information network system, meanwhile it can also provide a practical reference for those who engage in network engineering.
Keywords/Search Tags:project risk management, risk identification, risk response
PDF Full Text Request
Related items