Nowadays, security industrial has being passed 19 years in China, in this course, information techniques applying comes into existence, from simpleness to miscellaneous, computer techniques and communication techniques have got a worldwide exertion. Information system's adoption, greatly improves the whole security markets'operation efficiency. As same as other industrials, the conditions and potential aftermaths that a great information technology adoption must own requests an information system must have high dependability and low risky, therefore, construction of security information system gets a higher and higher demand. Combine with a idiographic conditions, security business office as a security form's basic business site, need some postulates such as stable running equipments, safety operating environment etc. This article bases a background that HX Securities RenNan Office will build a new business site due to the office's remove, a new machinery room must be rebuilt, then applies related knowledge of Risk Management of management science, to analyzes stages of the machinery room's construction which regards it as a project risk management, which contains project risk planning, project risk discernment, project risk response, including all functional units designing as physical environment, network structure, system equipment, specific applying , and computer hardware sub-system, software sub-system, machinery room exchange equipment, comprehensive wiring system, communication system, satellite sub-system, power & UPS sub-system, security monitoring sub-system, fire controlling sub-system, air conditioning sub-system, anti-lightening sub-system, which covers conduction of technology documents related to risk management in which equipment manage, technique manage contains, it's also a detail description based on the author's project experience which combined with the author's daily working accumulation , especially in the part of risk management.The paper focuses the analysis on the construction of machinery room of a security company, which comes from a view of project management. As it covers all sub-systems, so it can be regarded as a template which a security business office's builds an information network system, meanwhile it can also provide a practical reference for those who engage in network engineering. |