Eastern Route To Wear The Yellow River Construction Risk Countermeasures

Posted on:2010-11-15Degree:MasterType:Thesis
Country:ChinaCandidate:T S FuFull Text:PDF
GTID:2199360278972418Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
Along with our country reform and open policy unceasingly thorough and the socialist market economy system gradually establishment,the competition is day by day intense,the element of certainty increases day by day,various projects implementation can face more risks,the risk loss scale more and more is also big,these all request various projects group to strengthen own risk management.The divert water from the south to the north project construction process is a cycle long,invests,the specification much high,the system complex productive consumption process,in this process,has not known for certain the factor,the random factors and the fuzzy factor massive existences,and changes unceasingly, from this creates risk direct threat engineering project smooth implementation and success.The enhancement risk management to the divert water from the south to the north project construction and the entire economy,the society all has the vital significance.The engineering project risk management process including the risk recognition,the risk analysis and the appraisal and the risk controls three processes,is a closed-loop system.This article unifies the northward rerouting of southern river east line which implements to put on the Yellow River project,has with emphasis analyzed the domestic and foreign project risk management research background,summarized the engineering project management theory,the risk management theory,the project legal person risk and the project risk management process,studied the east line to cross the Yellow River project characteristic comprehensively,proposed cross the Yellow River engineering project risk management initiative control and the passive control two methods,and to cross the Yellow River project with the scene analytic method to carry on the risk analysis and the risk assessment,from the progress,the investment,the quality,the security,construction management goal realizations and so on high water and drafted immigrates the implementation process,studied has crossing the Yellow River engineering construction to manage the risk which in the process existedAnd takes the corresponding countermeasure measure,argues vigorously the maximum limit display project investment economic efficiency and the social efficiency.Meanwhile cross the Yellow River engineering construction by the project insurance in the east line the application,carried on key has analyzed and has studied the insurance all quarters right,the duty, the claim principle and the procedure,and put forward some proposals and the improvement measure.Finally has carried on the summary and the forecast to the next engineering project risk management research.
Keywords/Search Tags:projects for diverting water from the south to the north, cross the Yellow River project, engineering construction, The engineering project risk management, research countermeasures
PDF Full Text Request
Related items