| EPC is one of the most advanced contract mode in the project construction in today's world. However construction of a thermal plant is typically complicated project, as a result this study will be very significant in improvement of EPC management in China.Based on LanGuang thermal plant as sample, system engineering, and project management and information control with histography theory, in this essay, we will find out the key cause which affects process of project plan, and important faction of storing up basic date and arrangement relation plan in planning. This essay also analyzed key cause of planning control and how to manage design, purchasing, construction and testing running etc. At last, this essay briefed through creating a projecting organization and enhancing core of group to improve the EPC management level.Because of improvement of planning and management, EPC of LanGuang thermal plant made a very good record. |