Font Size: a A A

Agent System Mode Of Government Investment Projects Management Studies

Posted on:2009-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:G J LongFull Text:PDF
GTID:2199360245470105Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the transformation of government functions and China's investment and financing system reform, the government's total fixed assets investment in the proportion decreased year by year, the government investment areas and gradually narrow the scope of the project has also been gradually withdraw from business competition. Since the government bear the investment required to meet the social and public purpose, although in the whole society to reduce their proportion in fixed assets, but are still very important position and role. For a long time, my government in the implementation of investment projects in the part of a "multi-investment, super-scale, above-standard," the "three excesses" phenomenon. The reason, ostensibly as part of the project management unit professional inexperience, actually deep-seated reasons for the lack of government investment restraint mechanism. The implementation of "Agent System" so as to further transform government functions. At the same time, "Agent System" can change the past, "since formed," there are also defects. But government investment projects promote the development of the national economy is the main driving force related to the people's vital interests, its management model has been difficult to adapt to the development of government investment projects, Construction Agent System is the solution of this problem effective way.The results of this study strengthen the government how to guide the development of industries Agent System can be used for reference value for China's government investment project management and construction agent system from the point of application of catalytic role.The full text is divided into three parts, the first part (Chapter I), mainly on research background, significance and methods. The second part (Chapter II to Chapter III), the government investment in building major research project management, the government investment in building China's traditional project management abuses, the government investment in construction projects abroad experience, the theoretical basis for the implementation of Construction Agent System, in lieu of the current mainstream Formed mode mechanism analysis. The third part (Chapter 4), Construction Agent System model of the current mechanism and the main issues and make perfect Agent System and the idea of the management structure of the existing problems Agent System Suggestions.
Keywords/Search Tags:Government Investment, Project Management, Construction Agent System Management
PDF Full Text Request
Related items