Font Size: a A A

The Game Analysis In The Process Of The Construction Claims

Posted on:2011-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:P HeFull Text:PDF
GTID:2189360305467388Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
In our country, from the concept of claim first appeared in construction industry until now, the number of engineering construction claims have increased sharply. At the same time, the amount of money involved with the construction claims has increased. Construction claims happened in almost every project. But in the implementation and management of the construction claims, engineering construction claim is a weak link in the construction management in our country. Because the participants do not understand construction claims clearly and comprehensively, the method of the construction claims and calculation of the claim amount can not achieve reasonable, standard and scientific else. Meantime, the skills, strategic choices of claims and other problems related to the construction claims also can not satisfy the requirement of the construction claims. Then leading to the contractor can not claim and do not claim to the proprietor or the claim is no reasonable, even the proprietor doesn't support the problem. These problems of the construction claims determine the urgency of the claim problems research.This paper aimed at the claim for the construction process in the present situation and problems in our country, from the contractor to the point of departure by the use of economic theory of the classic game theory. To analyze the construction claims strategy choice behavior of the contractor and proprietor who are the main economic benefit main body in the process of the construction, and based on the result of game analysis on construction, we know that probability of success and the claim litigation comprehensive costs in the litigant phase, the claim amount of the contractor are the main factors which can affect the construction claims strategy choice behavior between the contractor and proprietor, the main factors also contain the claim litigation costs and the proportion of the negotiation compensation for contractor. And under the affecting factors in limited conditions, the result of game analysis on construction also can provide the balanced suggestions for the reasonable selection of the suggestion claim. Finally, based on the analysis of practical cases, we know that a scientific and reasonable claim strategy is the key of the successful claim. And from the actual cases reflects the strategic choice of the construction claims for scientific and reasonable factors affecting the importance of the construction claims strategy choice.
Keywords/Search Tags:the construction claims, Nash equilibrium, the game analysis
PDF Full Text Request
Related items