| Government-invested projects have a great proportion in the infrastructure in our country,and some of which lay very important roles in people's lives. Development of the fund input of government's investment project is greater and greater trends, the projects of up to ten million, several hundred million even billions of are getting more and more. It is one of the key problems demanding prompt solution that how to get reasonable distribution in the project with limited fund, and bring most heavy economic benefit sand social benefits in a most economic.It is necessary to search after our governmental investment project management pattern; Discuss the matter from the angles of different stages including project decision,design and construction in detail. It brings for ward that strengthen project determination which make it into the market; fuzzy bidding evaluation; increase technique design and working drawing bidding under the law system; Puts forward many advices of the reformation from five facets, including: perfecting rules of laws, strengthening governmental management; perfecting public bidding; perfecting supervision of engineering cost; quickening development of consultation; building flaw less service system of engineering cost.This article summing up the results of research on the basis of the combination of my practice, Suzhou National New & Hi-tech Industrial Development Zone ("SND") investment projects in construction cost management issues operable, and an in-depth analysis of the SND government investment projects in the decision-making, design, Implementation of the settlement of the four stages of the characteristics and found that the existing problems and proposed a path to solve the problem, including: SND government investment project management model used to implement Agent System; for the proposed project and the need to conduct feasibility Techno-economic feasibility; bidding system for the implementation of the design; to promote the implementation of programs designed to optimize the design supervision; all directions contract management; actively promote the engineering bill pricing model; rely on the construction cost of the professional bodies to conduct the entire process of project cost management; government projects to improve project cost Follow-up monitoring mechanism, and so on. |