Font Size: a A A

The Engineering Item Evade A Management The Risk Method Research

Posted on:2009-01-01Degree:MasterType:Thesis
Country:ChinaCandidate:G L QiFull Text:PDF
GTID:2189360272484622Subject:Project management
Abstract/Summary:PDF Full Text Request
Business of the ultimate goal is to profit. However, there are a number of business operators, operating direction is not clear enough, only the size of lightly-effective; only the pursuit of size, not profit margins, project costs and conditions of the contract, leading to the award happily, the implementation of the contract when struggling , Clearing works only when the low-profit or even losses. There are also a part of enterprises or individuals, taking advantage of the drilling policies and regulations, the use of other management flaws, damage the interests of others for their own unjust enrichment. Shopping centers such as the battlefield, the construction business risks throughout the entire risk of operating the entire process, from the project, bidding, contracting, project management, maintenance, and so we need to fine Qing Qian, a careless move the whole game Are lost, and some of the risks that may cause a serious loss of business or even close down.Through part of the operation and management of construction enterprises in a number of examples to explore the project to avoid the risk of operating a number of ways. Contact the project, bidding, contracting, construction management, such as after-sales service process to master some of the laws adhere to the principle of a number of things, such as some of the conventional understanding of the risks and seize the risk management process to identify project risk, project risk Assessment of the risk of the project in response to the project, as well as risk control methods, for the operation to take risks to avoid, mitigate, or transfer of portfolio strategy, and so on, and refining the management system, strict procedures, to a large extent, will be able to avoid operational risks, reduce economic losses.Through the construction business to avoid the risk of a study on the project in advance, in the matter, after the operation in the course of a number of ways to avoid risk. Construction enterprises to control risks, in addition to the establishment of a sound management system, strengthening the implementation of the force, but also a variety of management measures will be implemented, the responsibility to the people, rewards and punishments fairly, accountability to the people. Strengthen the management of the process beforehand, in the matter, after the control, in order to avoid an effective operational risks, and create greater economic benefits.
Keywords/Search Tags:Engineering project, Evade a management risk, The method research
PDF Full Text Request
Related items