Font Size: a A A

The Project Manager Of Choosing Mechanism In Construction Enterprise

Posted on:2009-06-25Degree:MasterType:Thesis
Country:ChinaCandidate:G F WangFull Text:PDF
GTID:2189360272474200Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Project manager is the nubbin power of the architecture construction corporation, project manager's ability and diathesis is the key of the corporation's success. High diathesis project manager is a part of the corporation's core competition which can't absent. So choosing project manager is vital for construction corporation.Construction corporation must consider the follow two factors when choose project manager. One side, construction corporation choose project manager should review the candidate's ability and diathesis (competence), the manager selected must have the abilities suite for the project manager's station and have the view point,idio-goal and thumbprint which coincident with corporation. On the other hand, must think over the manpower resource cost when choose project manager, let the cost match the project manager's ability.Firstly, the paper sum up the researches related to the choosing of project manager, and based on the using of value engineering for choosing employee, indicate the function of the manpower resource isn't the ability of the employees, and contrast the function and the ability of the employees by research the project manager's function and ability. Point out that evaluating the competence character of the manager is more profound and comprehensive for depicting the candidate than evaluating the function of the project manager, and more tally with the principle of"person with ability—station—organization"which must insist when choose employees in modern manpower resource management.Secondly, the paper expatiate the project manager's engage lifecycle cost definition, composing, measure, control and management from the point view of engage lifecycle and manpower resource cost. Then, combine with the project manager's competence puissance evaluate and engage lifecycle cost analysis: when the candidate's value index V=1, the candidate can be employed; and the candidates those value index V﹤1 shouldn't be employed; corporation should employ the candidates whose V﹥1.Project manager's choose mechanism not only include choosing standard, but also include the choosing ideal, choosing strategy, procedure and choosing measure etc. this paper also expatiate the manager's choosing mechanism from the four aspects so you said. Architecture construction corporation can realize the aim of"choose right employee, using right people, retaining employee","employees and corporation growing together".
Keywords/Search Tags:construction corporation, project manager, value engineering, choosing mechanism
PDF Full Text Request
Related items