The Risk Management Research Of SCADA System Project

Posted on:2009-04-08Degree:MasterType:Thesis
Country:ChinaCandidate:J QiaoFull Text:PDF
GTID:2189360245970106Subject:Project management
Abstract/Summary:PDF Full Text Request
In 2008, the worldwide attactive 29th Olympic Games will be held in Beijing, as the important symbol of the Olympic Games - the host torch will become the focus of this Games. At the same time, the athletes, reffrees and news reporters all over the world those dinner will be an important project. Therefore, as these two projects' reserve energy - fuel gas will become an essential energy.In order to guarantee the fuel gas supply of the host torch and any necessary facility in the Olympic Village such as dining. The BCCG Ltd.Co. continue the gas regulation' design and construction which will answer for their installation and debugging.In order to carry on the monitoring at the working condition of the gas system in the Olympic stadium and the Village, We especially use the gas intelligence management information system (SCADA system), promptly feed back the data to the gas group control center, so that we can monitor and guarantee fuel gas supply and feed back the using condition at any moment.In order to ensure the implementation of the project smoothly, the key is no fault in the following movement, before the project implementation, besides workingout of the plan as the general project, the main work is to manage the risk factor management to in the project. The present paper produces under this kind of background.According to the project management in risk management theory, at first we carry on the recognition to the project risk factor, mainly induces the technical factor, the management factor, the progress factor and the expense factor. Regarding these risk factors which distinguishes, according to the former experience as well as the similar project summary, carries on the further analysis to these factors, according to its influence degree , divides into the important factor and the general factor. The risk factor analysis result should plan as the risk with the measure important basis, in view of the different risk factor, uses different methods, including elimination risk, shift risk, and establishing feasibility measurement. The measure is whether feasible , the key lies in to the risk factor monitoring. The present paper is defers to the risk recognition, the risk analysis, the risk should carry on the compilation with the risk monitoring for the vein.from this project implementation, basically arrived initially in the progress, the expense, the quality request, has also achieved the anticipated goal regarding the risk factor management.Through this project, the theory and the practice organic unifies in together and utilize, each stage which carries on in the project all summarizes the very good experience.
Keywords/Search Tags:SCADA, risk factor, recognition, analysis, replying, monitoring
PDF Full Text Request
Related items