Font Size: a A A

Project Program Cost-control Research Of Dadingzi Mountain Wharf

Posted on:2008-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y F LiFull Text:PDF
GTID:2189360242964562Subject:Project management
Abstract/Summary:PDF Full Text Request
Although the number of project-constructions and the cost of investment are rising in today's China, the cost-control research and application of project-constructing program are still backward. As the reform going on, market competitive system forming, the production and management of the construction corporations deeply changed; as a result, project cost-control becomes the determined role of the market competitive power of every construction corporation, the key content of project program management as well. Therefore, the research to the project cost-control has reasonably significant function on improving the corporations' competitive power.Basing on the brief analysis of present project cost-control situation, this paper focuses on the problems of the Dadingzi Mountain wharf project cost-control, including the idea, aim, content and process of cost-control, the organizing and effecting the controlling process, and the cost-reducing method, the cost-checking, too. Compounding the practical, the paper forms the project cost-control system of Dadingzi Mountain wharf project and get good effects while using in practice. During constructing of the project, in order to achieve the planned-cost object, we need to carry out effective approach on expense controlling, analyzing and forecasting of project cost trend to pledge the accomplishment of the project-control object. In this cost-control system, the paper especially discusses the cost-control immediacy and its use during the controlling process, also chooses the Earned Value Theory to apply with the practical cost-control, not only gets high profit but also gives the basic idea of project-cost immediate controlling.Project cost-control is a systematic program. It should centralize the cost-control, set controlling object and confirm controlling responsibility, and also fulfill specific department and individual. To construct the project cost-control system which contains all departments, all processes even all board, to implement all-angle monitoring and controlling, can help us promote and rise the level of project construction, technology and management greatly and comprehensively.
Keywords/Search Tags:Project-program, Cost-control, Method researching, Earned value theory
PDF Full Text Request
Related items