JEPC Project Department Of Operations Management System

Posted on:2012-05-30Degree:MasterType:Thesis
Country:ChinaCandidate:F C LuFull Text:PDF
GTID:2189330332497623Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
As the power industry, and Jilin Electric Power Construction Company of construction enterprises in the project management, and had a hard search for more than twenty years, the basic law in the implementation of project construction, but because of the control mode is not a great success, there are still many problems, even the threat to their survival and development.Project management through the implementation process, and to improve project management plan and implement the project manager assumes overall responsibility for and enterprises and establish internal ,contractors and enterprises and workers among the principal, the right, and Jilin Electric Power Construction Company find the project management organization and control mechanisms to Jilin Electric Power Construction Company management, improve efficiency and enhance comprehensive strength of the enterprise with reality.Jilin Electric Power Construction Corporation under the State Grid Corporation, is the only company in Jilin Province Electric Power Construction with a qualified general contractor of construction and installation of large state-owned construction enterprises in Jilin, Jilin Province Electric Power Construction Company the original thermal power first, second, third engineering firm Twice from the reorganization. After the formation of a large number of restructuring the debt and assets is not good. Restructuring at the beginning, and can not form an effective force, the company does not operate effectively together. The adjustment of national policy making thermal power construction market nationwide has shrunk dramatically, as with other Electric Power Construction Company, Jilin Electric Power Construction Company is sitting on a lot of manpower and machinery but no project can be dry; on the other hand, the state power system (Chang Wang Separation) would power plants separated from the power system, the establishment of Datang, Huaneng's five separate legal entity, then the domestic power plant project by the five companies (the top five companies) invest in the construction. Construction of five major domestic power companies use the opportunity to depressed market, coincidentally reduced engineering costs, forcing more and more construction companies to undertake the construction of low prices. In such historical circumstances, To the expertise of Jilin Electric Power Construction Company's project was to improve operational management, establishment of internal contracting mechanisms, the establishment of professional offices. And the southern project as an opportunity to use the new in project management operations management project, so well done South project owners and the company's goals, and achieved good economic and social benefits. And then solve the company's current presence in project management can not be effective use of resources, inefficient and unclear organizational structure, personnel responsibilities are not clear, promiscuity, extensive management, not the introduction of modern management methods and concepts, such as the high cost of the project Problem. Department of the project matrix according to the company operation and management requirements of the project, people-oriented, user-friendly management will be the first place. All members of the team by example, clear division of duties. Spirit of harmony and lead the scene of the workers, unite as one to do their work. A variety of labor competition, Pioneer Party, Youth commando enhance our cohesion. Careful analysis of team members, keep a cool head, in-depth investigations and the facts, research questions, formulate policies, to change old style of play, to develop practical measures. Construction of scientific organizations optimize resources, effective balance and harmony, the implementation of supporting measures to reduce costs, maximize the mobilization of workers to actively, reasonable implementation of the project management plan, the successful completion of project construction and the management.Jilin Electric Power Research Institute trial operation of the unit gives the following conclusions:State Power Cogeneration Co.,Ltd.,Jilin Jiangnan complete Unit 1 of started trial operation process in line with"thermal power construction project started commissioning and acceptance"requirement , the quality of commissioning trial run to"adjust the trial operation of thermal power project quality inspection and evaluation standards,"the fine Grade standards,plant operation safety,stability,transfer ofplants into the appraisal period From the construction phase of the project to transfer production units are successfully completed the requirements of owners,has been State Power Northeast Branch,National Thermal Power Co.,Ltd.Jiangnan Jilin,Jilin to the Commissioner of companies highly.South Works project greatly enhanced the victory and even the whole company'S confidence in the company is in a slump during the time inspired the morale of all staff. Meanwhile.construction works for other set in the banner and role model.Of course,any kind of project management model has its advantages and disadvantages of project management in the south also exposed some problems,but all aspects of comprehensive reasons,we believe that the use of Jilin Electric Power Construction Company for the project management matrix is still very possible . For companies to strengthen management , improve economic efficiency,enhance the comprehensive strength and competitiveness in the market has important practical significance Success of the project management through the experience of South can understand:1.matrix.style project management needs to adapt to the current development of the company,project management largely successful transition to the future projects to promote this management model.2,matrix management mode is conducive to the deployment of company resources.3 , to improve the company'S market competitiveness and labor productivity,and reduce the construction cost of production,to solve the company'S previous project management exist many problems.4,to strengthen the company'S ability to control the project,the company management requirements of the project can be timely and effective implementation 5.matrix management model by adding a project contract system,improve the professional branch of the construction project and the enthusiasm,the technical aspects ofthe professional division to find ways to speed up the construction progress increased labor productivity.This paper analyzes the Electric Power Construction Company under the original project management model the existing problems,the use of project management theory and knowledge , analyze the advantages and disadvantages of various management mode for re—design of Jilin ElectricPower Construction of a new management model , and South project implementation.Project management lnatrix to solve the previous problems in the south project a success.Jilin Electric Power Construction in China,the country won the honor for the establishment of adequate Jilin Electric PowerConstruction market and steadily laid the foundation for sustainable development.
Keywords/Search Tags:Jilin Electric Power Construction, Project management, Implementation plan
PDF Full Text Request
Related items