Font Size: a A A

Pipeline Building Cost Analysis And Strategic Research Of Guangzhou Gas Group

Posted on:2012-08-29Degree:MasterType:Thesis
Country:ChinaCandidate:K ZhongFull Text:PDF
GTID:2189330332471763Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The pipeline building engineering management of Gas enterprise is to optimize company process, adopt engineering management method and measure, control the whole process during the whole project construction, so that ensure the whole project to be completed on time with good quality and also can achieve the goal of good economic benefit.When the price of gas resource is relatively stable, the residential gas consumption is relatively stable, and the gas users become more and more, this article give analysis for every aspect of pipeline building cost in Guangzhou gas group, and give some strategic research.Pipeline building cost is an important part of investment in gas enterprise management, which is the important prerequisite and key link to achieve economic benefit, so to control the cost effectively can enhance the marketing competition. Regarding to group pipeline building process, this article give cost analysis from project decision-making stage, programming design stage, bidding stage, construction stage to the last completed stage, and put forward some cost control methods and measures in every stages, also strengthen the view of control beforehand is the most important, and also need combine control online with control afterwards. Meanwhile, this dissertation also mainly gives discussion and research on the cost control and countermeasure of construction stage.Decision-making stage proceeds feasible analysis and economic analysis; programming design stage implements performance to improve design working efficiency and quality; biding stage adopts perfect bidding system to predigest bidding process, etc.; construction stage supervises bidding, control modification, guarantee quality, ensure safety, and adopts array chart to control construction processes; completed stage completes engineering settlement on the premise of guarantee for passing test, data integrated, engineering alternation implement.The cost of gas pipeline building is very huge, it account for the largest proportion in the whole group budget every year. How to maximum economize the cost on the premise of ensure the engineering quality is a bottleneck in gas enterprise development. It should standardize all engineering project by the ways of price fixing in engineering bidding, construction sub-contract, gantt chart to plan, schedule and analysis, engineering quality should link up with engineering cost, so that to control cost in gas group in Guangzhou.
Keywords/Search Tags:gas, pipeline building, cost, strategic
PDF Full Text Request
Related items