| Reclamation project is a key project in recent years, the Binhai New Area, themain distribution area in Tianjin, Tianjin Dongjiang port area of coastal tourism zone,Lingang industrial area, South Industrial Zone of several functional areas, eachproject is not blindly launched, but through the research and discussion of experts,issued on the basis of the feasibility study report of the project, the correspondingeconomic feasibility study report, environmental impact assessment, combined withcharacteristics of the region carried out a thorough city planning, such as the mainport, mainly for industrial land, Dongjiang port to port business of commercial land,tourism area focusing on tourism service industry. Around the development prospectsof land from the sea is good, but not blind development, must pass a rigorousscientific proof, combined with the regional development needs, combined with theneed of economic development and the environment bearing capacity aftercomprehensive consideration.This paper introduces in Tianjin Binhai tourist area a construction commissionmode (BT mode) construction of the reclamation project, this project is fromreclamation construction in coastal areas and beach, also introduced the applicationand the historical evolution of the BT mode in engineering; in carrying out such ahuge project first, through the investigation of economy, culture and the experience ofother regions, issued in the feasibility study of the project feasibility and economicenvironment report, report to the project construction opinion; in the construction ofthe cofferdam cofferdam, filling, vacuum preloading and soft foundation treatment, soas to reach the ground load index for acceptance of completed construction, this paperintroduces the project management in the process of engineering construction, mainlyfrom the scene management, project safety management, after completion andacceptance of the settlement business are described; the construction contractorscalculation are described, and the cost of the project cost and project approval afterthe analysis and research; according to the project for the BT model to build theproject, starting from the advantages and disadvantages of the traditional mode andBT mode The cost of the construction, construction of the project, the timeliness offinancial management fees and management fees and other aspects of the in-depth comparison; in the completion and acceptance of project construction, thecharacteristics of the BT mode by the employer to repurchase program, this paperaccording to the actual situation of enterprises and the government repurchaserepurchase some operation methods. And put forward the idea of the futuredevelopment of BT model. |