Font Size: a A A

Contract Management And Claims In International Contracting Project Of Vientiane Urban Improvement Project In Laos

Posted on:2007-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:W S WangFull Text:PDF
GTID:2179360182495569Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The Conditions of FIDIC is most prevalent General Conditions during the international project. According to International Finance Organization and International Tradition, all credits include credit of between-in governments or preferential credit and credit for International Finance Organization e. g. World Bank, International Monetary Fund, Asian Development Bank as construction fund must proceed in international bidding. All Bidding Documents base on the Conditions of Contract for FIDIC which concretely stipulate all aspect of project management and highly maneuverability, furthermore it integrates with engineering, technique, law, economy, management. The abstract regarding the Conditions of Contract for FIDIC to introduce items origin, survey for international project, content of contract management, management and method of Claims under the Conditions of Contract for FIDIC.The abstract link my approx 10 years experience abroad to summarize some experience on contract management and Claims management. I will emphasize on the cause of Claims and classify of Claims under the Conditions of Contract for FIDIC as well as the Contractor shall adopt items and origin when encountered Claims incident, also expatiate document of Claims, procedure for Claims, attendant proceedings and risk apportion of the Employer and the Contractor under the Conditions of Contract for FIDIC. In addition, I enumerate successful change and claim in accordance with Vientiane Urban Infrastructure and Services Project and put forward my opinion and suggestion to be beneficial for my colleague.
Keywords/Search Tags:International Project, FIDIC, Claims
PDF Full Text Request
Related items