Font Size: a A A

Design And Realization Of Integrated Lab Management System

Posted on:2010-07-23Degree:MasterType:Thesis
Country:ChinaCandidate:X XiaoFull Text:PDF
GTID:2178360278460305Subject:Computer application technology
Abstract/Summary:PDF Full Text Request
With the further deepening of college construction and management reform, the laboratory, an important base for scientific research and teaching, is constantly improving and developing. It naturally follows that integrated lab management has recently become a hot issue in the field of college teaching and management. It not only directly concerns the quality of college talent nurturing, but also is an important guarantee for the conduct of teaching and scientific research. Based on the rigorous analysis of the present situation of the laboratory management of domestic colleges, especially of the situation of information management, the writer thinks that the existing means and tools of management can no longer satisfy the requirements of laboratory construction and management at present. Consequently, the writer raises a constructive program about information management system---"The Integrated Lab Management System". Besides, the writer designs and explores a practical software system with a certain prospect of application.This thesis analyzes the present situation of laboratory management of domestic colleges and puts forward a program of business integration and data sharing. What's more, the writer conducts the function programming, process designing, technique achieving and finally accomplishes the demand analysis of initial construction. This thesis mainly focuses on the system applied RBAC access control mode and the use of the workflow to process engine to carry out cooperative working.Meanwhile, it discusses the system's safety, operation, preservation and management work. The writer also makes a plan about the system's future development and sets forth some advice concerning such information construction in colleges as building a college-level data center. The essential work is as follows:①Analyze the present significance and potential needs of college laboratory's integrated management.②With the application of college laboratory's integrated management as the principal task, study a variety of existing techniques , including the J2EE outlines, Oracle basis, RBAC access controlling technique, project management outlines, workflow engine processing technique .③Realize integrated lab management system, including the laboratory management, lab construction management, practical teaching management, open course choosing, dynamic equipment management, big instrument sharing platform, evaluation and advance warning, intellectual website and etc; carry out systematic function test in specific units.
Keywords/Search Tags:management system, project management, RBAC competence management, workflow
PDF Full Text Request
Related items