| Along with wireless activity development,The Blower stands increases day by day,The radio-frequency spectrum resources are day by day tight,The electromagnetic environment worsens day by day,The radio jamming increases unceasingly。Normal work which and radio-frequency spectrum resources effective use stands for the guarantee Blower,Must strengthen the radio monitoring network construction。Realizes gradually monitors the non-slit cover radio Because the VHF/UHF frequency band radio transmission's characteristic limits,The national radio spectrum management《the radio monitor facility constructs plans》to propose that the massive Fixed Monitoring Station and Mobile Monitoring Station to need to construct,Proposed that the massive Fixed Monitoring Stations and Mobile Monitoring Stations to need to construct,According to national《Radio monitoring facility construction standard and specification》request,The municipality, the provincial capital city, the autonomous region capital, economic planning Danlie, the cross-province radio monitoring network are Radio Monitoring Network of Class A,The prefecture (state, pledge) the radio monitoring network may rest on various platforms station quantity, the economic development level, the geographical position to determine that constructs Radio Monitoring Network of Class B or C,The city radio monitoring station does for the radio monitor work most basic unit,Undertakes VHF/UHF the frequency band main monitoring network construction, to use and to maintain the duty。This article studies in the VHF/UHF radio monitoring network construction project the fixed inspection station most superior selected location question,Proposed the GIS space analytic method and the analytic hierarchy law unifies one two stage selected location method。Proposed that asks a group of f Fixed Monitoring Stations alternative plan using the GIS space analytic method the method and the principleAnd draws support from the analytic hierarchy process to carry on the comprehensive factor comparison to the alternative plan,And draws support from the analytic hierarchy process to carry on the comprehensive factor comparison to the alternative plan。Has given in the analytic hierarchy model each judgment matrix element value scope,And take the Weifang radio monitoring network items of basic construction in the Fixed Monitoring Station selected location application as the example,Provides the reference for the VHF/UHF radio monitoring network items of basic construction selected location,Fill present project selected location theory in this domain research blank。... |