Font Size: a A A

Analysis And Design On The Mobile Project Management System

Posted on:2008-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:D L ZhangFull Text:PDF
GTID:2178360242959995Subject:Software engineering
Abstract/Summary:PDF Full Text Request
There is a lot of information to be managed and communicated in the practice of project management. The traditional got-up operation brings prodigious waste of manpower resource, and works the obstacle of project management fine. In the information communication with the other implication men, the low degree of automatization can affect the work efficiency of the other implication men. Then influencing the efficiency and level of the whole project management. It requires a project management sustainment system accorded with international project management criterion that is built by corporation. Via information system, the project management criterion is ulteriorly solidified by communication. Then enhancing the efficiency of the project management, increasing stakeout grade of project. Meanwhile using the abundant manage capability of computer can open out the business capacity and increase the decision-making capability of the project management.Mobile Communicate Ltd as a corporation of capital-intensive, skill-intensive and knowledge-intensive, a lot of projects are systems engineering of complicated and formidable, refer to various management, such as program, scope, schedule, quality, investment, compact, personnel, document etc, and a large number of information need effective organization and management. Numerous departments and units need communicate and correspond, such as mastermind, research on feasibility, design, construct, intendance, material supply, manage and operation maintenance. Different projects have different resource requirement, structure and demand, furthermore, the same corporation different tasks have their schedule and resource requirement, thus, different management will result in different schedule, cost and quality.To everybody and any organization, developing enterprise application software must be challenge of austere, and people devote huge energy and resource, try to improve efficiency and quality, reduce development cost using technique. In all these technique, it is proved that component is the most effective and reliant.Component is a steady factor in diverse system. In component-oriented software, management system on mobile project dose not compose of codes any longer, but compose of any steady component which is visible. Then system complication falling down, moreover, design and development is a combination.First from expressed, component-oriented software architecture reduce the difference between the code expression and the graph knowledge expression, thoroughly eliminated the fault between the software source code and the design mentality. Repetition use after test component, also make the mobile communication project management system more mature and stablier. "Had found a stable system architecture in a mutative environment", this is the most important reason why we choose component-oriented theory and method to build mobile communication project management system.This article first introduced the challenger and questions on mobile project management, according to initiation, planning, implementation, control and ending five processes groups and scope, time, cost and quality management, combining with mobile communication field feature of project management, take component as central analysis project management software demand, definite participant and use case, distinguishes the investment plan management, the project management, completion final accounts management, the investment benefit appraisal business component, uses the MVC pattern and the J2EE core pattern design business component service, in this foundation through appropriate cut-off, reserve and improve autonomy, business space component, obtains the clear integrity component-oriented software architecture and the system business function architecture, decomposes the display component, the flow component, the business component, operate component and so on. These foundation component reciprocity and interdependent then make up of greater granularity business component, and these components to compose the subsystem again, many subsystems composing project management system. In the component development and the test, according to the system software architecture, the business component terms of an agreement, the component connection service which the definition completes, uses the J2EE core technology realization expression level component, business component and so on, and has carried on the component unit test to these foundation components, has produced the component unit test process and the example explanation.
Keywords/Search Tags:Management
PDF Full Text Request
Related items