Font Size: a A A

The Wireless Schedule System

Posted on:2006-05-15Degree:MasterType:Thesis
Country:ChinaCandidate:R ShaFull Text:PDF
GTID:2168360182956884Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the development of computer and wireless network, the conventional mode of based network and the way of man-operation,can not satisfy require of develop that communication is develop so fast . In this paper, it roots in the project of connecting wireless with the Telecom. It introduces the designer of the communications, the Database and the operation platform in the wireless, includes the relations among them, how to realize the various operations logic and data logic. According to the demands of the system, with the limitation of operations, it brings forward the relative unattached principles among operation, communications, and data. Object oriented degsin and modulization development make it easy to maintain and upgrade the project. Multithreading, which is to handle parallel affair, guarantees the capabilities of distributing, parallel communication and security of network accessing. Communications finish the connection between database and gateway, provide the function of receiver and transmitter message.It provides all kinds of data inter -face to different user.It can connect the different gateway without using the manmade.It improve efficiencies with network. Communications can run with all kins of platform and without many other change. In the operations logic of the system, applications server connect database by wireless, which guarantees the integrality and reliability of data accessing and business operations.Operations platform is finished with visual c++ 6.0. It can read data and write data by a timer, send data by another timer.It includes the function of backup data.In the design of database, data receiver and data transmitter of the operation platform and communication visit the same database, guarantees unification of data. According to running of the system for a time and the testing results from testing company, every capability indexs are as expected.It was used already, produced the better benefit, finished the target of both profit.
Keywords/Search Tags:Wireless net, Schedule, FPGA, DSP, Compile, Visual C++
PDF Full Text Request
Related items