"Reconstruction" Introspect "Planning"

Posted on:2011-12-09Degree:MasterType:Thesis
Country:ChinaCandidate:X LuFull Text:PDF
GTID:2132360305967108Subject:Urban planning and design
Abstract/Summary:
2008 "5·12" Wenchuan earthquake hit China heavily and have been making an unprecedented losses in personnel and financial resources, which also exposed that there are a number of potential problems and loopholes in the security of our building mechanisms. Face the country's reconstruction of the general principles and policies——"three-month placement, over five months to transition, three-year reconstruction, five-year development.", since 2008 the nation's large-scale disaster since the entry of the reconstruction phase. Social, economic, cultural and various aspects of the building exposed the problems of China's reconstruction, the complexity of the reconstruction work force the Chinese to re-reflection. In this paper, Xia Si Village Jian Ge county in Guangyuan City, Sichuan Province as the research object, use the working methods and research methods, the reconstruction process throughthe entire shadow interest rate track, record of solid-state disaster site inspection, problem analysis, study visits, interaction with the villagers and so on, to rebuild the timeline for the pulse line, through the actual process of reconstruction of the Xia Si Village and issues to reflect on the appropriateness of after the disaster reconstruction planning, hoping through this process of reflection of the villages after the future construction can be Reference opinions.First of all, the paper through the practical analysis of the after earthquake disaster area present situation, explain the reason why choice the xia si village as the post-disaster reconstruction key research. Through the all around and the thorough investigation status of the village, Understand the village's traditional culture,damage situation and the rebuild hope of the villagers in different conditions, clear the many post-disaster complex problems which the xia si village faces.Secondly, on the basis of the reconstruction planning has been put forward and passed, through in time as the chakra line, and the whole process and the whole shadow track recorded all the reconstruction process of the village, compared with the actual construction planning, the differences and similarities in actual construction, through out the real problem mapping to reflect the advantages and disadvantages of planning and construction, through the actual situation to reflect not completely according to plan implementation plan of the real reason.The third, "Xia si village new elementary school" as the typical cases of application system in the new building structure and external rebuilding of the post-disaster reconstruction work, and also in time as a whole line of pulse rate tracking record the whole school built from the beginning to the end plan implementation process of all construction. Through the practical problem to reflect the advantages and disadvantages phenomenon of external rebuilding, through the real phenomena to discuss the quality with external rebuilding and villagers self-build, and whether the way of current outside external rebuilding really suitable for the village from the healthy development of the region.Finally, the article take the xia si village reconstruction process for the actual research object, making reflection of the xia si village's compilation and replanning, result expression, planning and implementation of management system and a series of problems, exploring the root problem of the rural planning is difficult to implement, and according to the actual needs and the distinguishing of the village, and hopeing constructive suggestions put forward for the future planning and implementation of the disadvantaged areas in China. Making practical contribution for our future disadvantaged areas construction.
Keywords/Search Tags:xiasi village, reconstruction suitability, process study, introspect planning
Related items