In this paper, control theory classification and its history are introduced first, then comes the importance of construction control in bridge construction, its contents and influence factors. And then expatiated on the cable-stayed bridge construction control, which includes: the method of the construction control, the computer simulation, error adjustment theory and analytical method in construction control on the cable-stayed bridge.Based on the theories above, the author introduces the process of construction control on Wusongjiang bridge in detail, the problem in construction and how to solve it. At last this paper give some ideas, suggestions and make an expectation about construction control.
|