Font Size: a A A

Research On The Evaluation Of The HK Wind Power Project After A Period

Posted on:2016-12-19Degree:MasterType:Thesis
Country:ChinaCandidate:Z M ZhangFull Text:PDF
GTID:2272330461494342Subject:Business administration
Abstract/Summary:PDF Full Text Request
Wind power generation of renewable sources of energy, clean energy, China tod ay facethe tense situation of conventional energy, serious pollution of the enviro nment, new energy mainly wind power shortage, the supplement of traditional fo ssil and other conventional energy supply to ensure energy can have the very im portant meaning to sustainable security of supply, but also a strategic move to fu ndamentally reduce the environmental pollution, climate change, improve the ec ological environment. Therefore, in recent years in China, growing on the wind re source competition, resulting in theconstruction of wind power to the pursuit o f high speed, large capacity, however, post project evaluation in project constructi on at last, as an important link, is on the early stages of the project decision-ma king, construction process, production operation, economic andsocial benefits an d comprehensive evaluation influence and analysis, through the projectpost evalua tion, help to improve the project decision-making level and the investment inco me, also has the important guiding significance and reference value for the susta inableability of project and social benefits. HK wind farm is located in S Provi nce, northern coastal beach site, around the ponds, salt field is numerous, land pla nning installed capacity of 300000 kilowatts, is expected to complete the constru ction in six phases, one phase of the project in July 19, 2009 to obtain the pr ovincial development and Reform Commissionproject approval opinions, using th e single machine capacity 1500 KW, wind turbine towerheight 70 m the budget, a t otal investment of 558580000 yuan, 11284.44 yuan investment in /KW unit. The actual total investment of 522245900 yuan, the unit investment 10550.42 yuan/KW, completed in January 14, 2010 33 Typhoon aircraft 240 hours trial operat ion examination, and after a comprehensive review of national engineering const ruction quality award examination committee, in 2012 June as the national quali ty silver works. At present,HK wind farm has become a model of efficient ecol ogical economic zone in the local new energy construction, provide Everfount cle an energy for the local economic development.This paper takes the HK wind p ower project a project as the research object, through in-depth study of the HK project, the collection of pre project decision-making, project implementation an d project operation and other aspects of the data on the pre projectwork, decisio n, implementation process, project operation, the effect and benefit of project,and the project objectives and sustainability and feasibility study report contrast for thecomprehensive analysis and evaluation system, and according to the analysi s and evaluation of the results, find out problems and gaps existing in the proces s of project construction, summed up the experience and lessons of the project decision-making,construction, operation, management and other aspects, proposed to the HK project operation and future project construction proposal. HK project post evaluation study on thenormal operation of enterprise HK project and the f uture of wind power project constructionhas certain guiding significance...
Keywords/Search Tags:Post project evaluation, HK project, Clean energy, Success degree evaluation
PDF Full Text Request
Related items