Research On Risk Management Of Datang Jiangshan Natural Gas Combined Heat And Power Project

Posted on:2017-01-25Degree:MasterType:Thesis
Country:ChinaCandidate:Y MengFull Text:PDF
GTID:2132330485961289Subject:Business administration
Abstract/Summary:PDF Full Text Request
Project management is a mature discipline, it utilizes the scientific method to manage the project. In project construction, produced by uncertainty and risk, due to the large scale construction project, cycle is long, numerous participants and complex technology, causes the uncertainty factors influence more prominent in the construction project, the risk which multiply, so you need to take effective risk management methods to reduce the risk or reduce the risk of losses, to ensure the project to achieve the expected goal. With the constant improvement of the requirement of engineering project construction in our country, to achieve better economic benefit and social benefit, to strengthen the risk management is imperative. Project risk management as part of project management, project risk management is through the risk identification, risk assessment and risk control, and on this basis, the reasonable use a variety of management methods, techniques and methods of project activities involving the effective risk control, take the initiative, create conditions and try to enlarge the beneficial result of risk events, properly handle risk accident caused by the adverse consequences, with minimal cost to ensure safe and reliable to achieve the overall goal of the project.In the process of research in this paper, the main use of fuzzy comprehensive evaluation method to establish a set of perfect for datang jiangshan gas cogeneration engineering project risk assessment and control system. After the above series of project, can put the datang jiangshan some risks that exist in the natural gas cogeneration project and these risks may be the cause of the analysis of the system. Through the establishment of new evaluation system can be effective for datang jiangshan gas cogeneration project of project risk and datang jiangshan gas cogeneration engineering project risk prevention provide effective guidance. For datang jiangshan gas cogeneration projects after the increase of project risk management has important practical significance, for the future similar project risk management has a relatively strong theoretical significance.We found that in the study of datang jiangshan project risk management of natural gas cogeneration project is the main risk types in market risk, technology risk, financial risk, policy risk,.schedule risk, economic effects and social effects. Against these risks can take the improvement of the safety production management system, the working flow of electricity production specification, project operation personnel risk awareness, promotion of project risk early warning system and security of informationalization construction of the project by several aspects to ensure the project implementation.
Keywords/Search Tags:fuzzy comprehensive analysis, Project risk management, Risk assessment
PDF Full Text Request
Related items