| With the economical high speed development, Coal mine construction is an important part of building. The energy anxious has been becoming an urgent solved question in our country which take the coal as the primary energy. As one of main methods of well constructs, the freezing is widely applied for its many merits such as security, economical and fast.For shaft construction projects in deep alluvium, it has a long construction period, the large investment scale, involving a wide range of risk factors and the wide variety of different quantity. This paper has established construction risk management information system of Kwok Tuen mine construction projects in deep alluvium, through in-depth research and analysis, timely and accurate assessment of the frozen wall and the wall structure, security, monitoring results are timely feedback to decision-making, design, Construction. By security monitoring and control, we can access shaft safety monitoring and control of information, timely control and freeze digging assemble programs in order to effectively avoid the risks of mine construction. |