Font Size: a A A

Causes And Effects Of Delays And Suspensions In Construction Projects In Ghana

Posted on:2024-06-08Degree:MasterType:Thesis
Institution:UniversityCandidate:MICHAEL BIO KORANKYEFull Text:PDF
GTID:2542307166965899Subject:Civil Engineering and Water Conservancy (Professional Degree)
Abstract/Summary:PDF Full Text Request
Many projects in Ghana construction industry experience extensive delays thereby exceeding the project duration date which often lead to costly disputes and claims between parties.Therefore,this research presents the causes of construction delays,and the factors contributing to construction delays.The state-of-the-art technology used in addressing the issue of delay was discussed.Based on the literature,the theoretical frame work was developed.Consequently,questionnaire survey was conducted among 93 major project stakeholders in the Ghanaian construction industry which includes the contractors,consultants and clients.Relative important index of each factor was calculated and ranked,and according to the highest ranking of these factors the top important causes of construction delay influencing the Ghana construction industry were determined.Besides,the most important technology was also determined.Kruskal Wallis test was carried out to determine the significant difference between the factors of delay on causes of construction delay.The result of the survey revealed that financial predicament,lack of consultant site staff,poor skills and inexperience of labour are the most important factors contributing to construction delay in the Ghana construction industry.The result further revealed that labour input tracking model is the most important state of the art technology.Subsequently,the findings in this research will contribute in improving performance in the Ghana construction industry in terms of time and cost overrun.Further research is needed to investigate the model use in addressing delay issues in the Ghana construction industry.
Keywords/Search Tags:Delay, Construction, Contractors, Clients, Labour, Project
PDF Full Text Request
Related items