| At present,the application of EPC mode in the engineering field has shown an exponential growth trend.The state-owned enterprise construction unit,as the pilot and practitioner of the transformation from the construction general contracting mode to the engineering general contracting mode,is not rich in successful EPC cases and management experience.There are also requirements such as tight project duration requirements and strict limit design control.Because the author’s industry is also a monopoly state-owned enterprise,similar to oil,electricity and other industries,and tends to seek the construction mode of intensive management,decentralize some management responsibilities,and control at key control nodes,so as to grasp the main key control points and grasp the construction of major projects,it is clear that large state-owned enterprises are facing multiple risks in the market,management and operation during the exploration phase of EPC projects.Therefore,taking a construction project of a state-owned enterprise as an example,this thesis studies EPC risk from the perspective of whole-process risk management.The main research contents of this thesis are as follows: First,the research background and the current research situation at home and abroad,the concepts and theoretical basis involved in the research process,and the differences between different models;However,there are several methods such as literature research and expert interview,the conclusion is drawn after summarizing the investigation,and 24 risk factors are listed in four categories of bidding,design,procurement and construction,forming a risk list;On the basis of the above,the fuzzy comprehensive evaluation method and analytic hierarchy process are used to conduct quantitative evaluation in combination with the risk of a construction project;After the quantitative evaluation of risks,formulate countermeasures based on the evaluation results;Finally,the experience and prospect of the project risk control are summarized.Through this study,the risk list of EPC mode taking a construction project as an example is sorted out and formed,and targeted risk countermeasures are proposed.The risk solution can meet the risk commonality of domestic EPC mode projects,as well as the risk characteristics faced by state-owned enterprises and a construction project.It is of important reference value to the risk management of general contractor entering EPC market. |