Font Size: a A A

XX Road Construction Project Progress Management Research

Posted on:2022-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:E J ZhaoFull Text:PDF
GTID:2512306605985839Subject:Master of Engineering
Abstract/Summary:PDF Full Text Request
In various project management practices,project schedule management has alwaysbeen in a key and important position and play s an irreplaceable guiding role.Reasonable and efficient project quality Effective optimization management and control of risk and other factors can effectively shorten the preparation period of relevant projects,save relevant project management costs and reduce relevant project risks.With the continuous development of China's economy and society,the complexity and quality requirements of early stage schedule control and management of engineering projects include key schedule roadmap algorithm(CPM),planned schedule review management technology(PERT),ranking management algorithm,etc.the coincidence between these traditional methods and existing projects is gradually disappearing,Especially in the face of multi project parallel,it is easy to cause problems such as logn construction period or even delay.Effective planning and control is the essence of project schedule management.XX road project adopts relatively advanced project management methods according to the plan,and ensures the smooth realization of the agreed duration control objectives of the project through the preparation of scientific and reasonable construction schedule and efficient and feasible engineering plan duration control measures.This paper studies the scientific progress m anagement of XX road engineering project,analyzes the advantages and disadvantages of XX road engineering project progress management,and then realizes the high-level control of the engineering project,and finally realizes the expected effect.Based on the actual case enterprise of XX road engineering,combined with the actual characteristics of the road engineering project,according to the knowledge system framework of project practice of XX road engineering project schedule management,this paper puts forward a set of advanced management system for road engineering project schedule management and in line with the characteristics of road engineering project.The schedule management model of road engineering project optimized to control is in line with the actual engineering.Finally,the studied schedule management method is applied to XX road construction project.According to the actual situation of the project,the schedule is prepared,and the implementation status results of the project are analyzed according to real-time dynamic monitoring.At the same time,Find out the causes according to the analysis results and take corresponding measures to control.
Keywords/Search Tags:Schedule management, Road engineering, Project risk, Duration target
PDF Full Text Request
Related items