Research On The Management And Control Of The Entry And Exit Of Highway Construction Materials Based On The Digital Platform

Posted on:2022-07-06Degree:MasterType:Thesis
Country:ChinaCandidate:Y B XuFull Text:PDF
GTID:2492306344476994Subject:Master of Engineering
Abstract/Summary:PDF Full Text Request
Cost control is the key to the development of highway construction enterprises.In order to ensure the long-term stable and healthy development of enterprises,cost management capabilities must be strengthened.In recent years,the government has actively promoted the construction of "Internet +" in the construction industry,but the highway construction industry has long been in a labor-intensive state of work,and it is particularly difficult to transform and upgrade.The highway construction industry is facing many problems in material management,which drags down the material management of enterprises and directly affects In order to control the cost of highway construction projects,it is particularly important to improve the level of material management through necessary technical means.Through analyzing the theory of highway construction project material management,highway construction project material acceptance business process and highway construction project material characteristics,analyze the problems in the management of highway construction project material entry and exit and propose corresponding strategies,relying on the digital platform to carry out the material acceptance management link of the material yard Step by step optimization.This article takes information integration as the technical direction,integrates information sensing equipment,data processing equipment,and integrates software and hardware to establish a road construction material entry and exit control system based on a digital platform,smoothly connects to the material acceptance management process,assists in the completion of the material acceptance business,and realizes the account.Optimized the rights of new users to use the system,analyze the material supply deviation between the supplier and the truck,and realize the sub-project material consumption accounting by non-fixed-point receiving and sending materials.Take the Minfeng-Luopu section of Xinjiang National Highway 315 as an engineering example.Statistics and research on the entry and exit information of the project’s materials through the 2020 winter holiday material reserve period.According to the project’s material statistics from November 2020 to May2021,the total stock of materials has reached tens of thousands of tons,and the system is online The application has formed a relatively intuitive chart information for the material access detection and statistical work of the project.Through data sorting,a broken line chart can be formed for the stage acceptance quantity of bulk materials,which vividly shows the change of the material acceptance quantity.The material management staff observes monthly With the addition of new bulk material statistical information every week,it adjusts the material quantity requirements of the stock yard storage quantity and the project progress,which is good for material coordination.The research results show that highway construction projects are managed through the highway construction material entry and exit control system.While ensuring the material entry and exit detection and storage management,the data-assisted material procurement decision-making work reduces the project cost,improves the work efficiency of the enterprise,and improves The market competitiveness of the enterprise.
Keywords/Search Tags:highway engineering, material management, technology integration, amount of bad accounting
PDF Full Text Request
Related items