Research On Schedule Management Of Weihai Chunfeng Coastal Villa Construction Project

Posted on:2022-08-24Degree:MasterType:Thesis
Country:ChinaCandidate:H M GaoFull Text:PDF
GTID:2492306317990709Subject:Master of Engineering Management (MEM)
Abstract/Summary:PDF Full Text Request
With the rapid development of social economy and the improvement of people’s income and living standards,people have an urgent need to improve the living environment,and villas have become one of the popular options.The competition in the construction industry continues to intensify.Strengthening the management and control of the progress of villa projects is conducive to the realization of construction period goals and the improvement of corporate economic benefits.This article uses the relevant theories and methods of project schedule management to study the schedule management of the Weihai Chunfeng Coastal Villa Construction Project.The article first analyzes the factors that affect the project schedule by introducing the characteristics of the villa project,the project organization structure,and the project schedule.Secondly,use the work breakdown structure diagram to complete the decomposition of the overall structure of the project,clarify the work rules and work logic of each part of the project,estimate the work duration of each sub-project,and draw a network diagram of the project schedule plan.Finally determine the key routes of the project,and optimize the construction period of the main structure on the key routes of the project and other projects on the non-critical routes to achieve the project schedule optimization effect.Thirdly,during the construction of this project,we carried out dynamic monitoring of the progress.Based on the data obtained from the monitoring,the S-curve comparison method was used to analyze the deviation between the actual progress of the project and the planned progress,and the earned value method was used to analyze the cost-schedule deviation of the project.,And make effective adjustments to this.Finally,the four aspects of organizational management,resource protection,safety management,seasonal protection are comprehensively used to build a comprehensive protection system to effectively control the project,so that the project’s schedule management plan and schedule control can be effectively implemented.Whether the villa project can be completed on schedule is not only related to the economic benefits of the enterprise,but also to the people’s living and working in peace and contentment.Therefore,it is particularly important to manage the project schedule well.The research of this subject will help to improve the economic benefits of construction enterprises and improve the progress management level of the entire project.At the same time,it can also provide reference for the progress management of other villa projects.
Keywords/Search Tags:villa Construction project, schedule, control, management
PDF Full Text Request
Related items