| With the steady development of my country’s nuclear power industry and construction of a large number of new units,the construction and management quality of domestic nuclear power plants has rapidly improved,reaching international advanced level.At the same time,the demand for supporting software development of nuclear power plants has also increased year by year,but the quality management research for such software development is still in its infancy.Simulator software is an important accessory during the construction of nuclear power plants.It is carried out simultaneously with the design and construction of nuclear power plants.It is also a condition that nuclear power plants should have before they are connected to the grid for power generation.However,the current research on simulator software development mainly focuses on technical methods.How to effectively identify and close quality defects at various stages and how to establish an efficient full-process quality management system still requires theoretical research and practical explorationBased on the current quality management status of nuclear power simulator software development,combined with relevant regulations and standards,this article sorts out the quality management issues of the entire software development project,analyzes and summarizes the quality management results of software development projects at home and abroad,and determines the planning,implementation and evaluation of the PDCA cycle,The curing method,optimize the quality management of the simulator software development.This article takes the quality management of the G simulator software development project as the research object,using interviews,surveys,statistical analysis,cause and effect diagrams and other methods,and finds that the G simulator software development project generally lacks open item management in the design stage and deviation items in the test stage Important issues such as defects in management,unreasonable human organization management,etc.,through the use of PDCA cycle tools to establish the management process of design opening items,optimize the management of test deviation items,improve human resource management,and carry out multiple cycles and corrections to optimize the original project.Some quality management systems have effectively promoted the efficiency of eliminating defects after multiple cycles,optimized the quality management process in the design phase and the testing phase,and effectively improved the overall quality management level of the project.This article researched four conclusions:(1)In the process of design opening item management optimization,the PDCA cycle effectively eliminated the opening items left in the design stage,established an opening item management system,straightened out the interface management of design funding,and formed The classification and classification management of opening items play a role in optimizing the quality management in the design stage.(2)In the process of optimization of test deviation item management,the PDCA cycle effectively improved the closing efficiency of deviation items,increased the one pass rate of the procedure test,established the deviation item management process and the deviation item priority hierarchical management,and formed the procedures and deviation items The responsible person management system has played a role in optimizing the quality management effect of the testing phase.(3)In the process of human resource management optimization,the PDCA cycle of design opening items and test deviation items is used to effectively optimize human organization management defects,establish a personnel performance evaluation mechanism,realize a dynamic and balanced division of labor,and form efficient teamwork The model has played a role in optimizing the quality management of human resources.(4)The quality management optimization results of the nuclear power simulator software development are extendable. |