| With our country economy growing,the degree of marketization,every field in our country has entered a stage of rapid development and fierce competition,as a result of the opportunities at the same time also make each enterprise is facing the challenge,how to win in the marketing environment challenge,need to enterprise upgrading comprehensive strength in every aspect.For indoor decoration engineering enterprises,especially the real estate enterprises also face the test,not only to the enterprise bigger and stronger,more strictly to the quality of the product,in keep original advantages and continuously improve their ability of competition.A square project is the second large projects of cofco property development in Shenyang,which is the largest comprehensive commercial residential community projects,the 5#floor,A square as A high-end apartment project,fine decoration design area of 25000 square meters,A total of 28 floors underground on the ground.The interior finishing project adopts EPC mode,and the integrated design,procurement and decoration integration mode of the apartment in Liaoning branch is completed.5#floor fine decoration project as A square A square is A typical component of the project,the project involves the roof decoration engineering,metope decorate engineering(including cylinders),ground engineering,doors and Windows,toilet decorate and electrical engineering decoration engineering and so on six maj or components.For such A short time,process trival,involving more than 100 quality inspection index of indoor decoration projects,based on the project quality management on the basis of relevant theories,combined with the characteristics of quality management of project,design A square 5#floor,indoor hardbound project quality management system,setting quality objectives and quality policy,quality planning accordingly,and compiled the project quality plan,and then improve the overall project quality management system,using the methods of "4 m1e",analyzed the influence A square 5#floor the influence factors of indoor hardbound project smooth implementation,key tools and potential risks.Finally,the use of PDCA circulation method,in view of the square of A 5#floor indoor hardbound project quality management assurance and control system,in principle,organization structure,key process control and quality prevention and so on has carried on the effective design and improvement.Work done for A square not only 5#floor,indoor hardbound the smooth implementation of the project,improve the owner satisfaction,improve the quality of the overall project has certain help,at the same time,the formation of the quality management system for indoor decoration for other indoor fine decoration project also has A certain reference significance. |