| In this paper,Shanghai rail transit line 17 A bid project as the research object,indepth study and analysis of the project risk management.This paper mainly uses the literature research method,case analysis,quantitative analysis and qualitative analysis,AHP and fuzzy comprehensive evaluation method to study risk management problems of Shanghai city metro line 17 project A tenders.The main research contents include the following three aspects:general situation of construction project of A bid section of Shanghai urban rail transit line 17.This part mainly introduces the general situation of the construction project of A bid section of Shanghai urban traffic line No.17,and analyzes the construction conditions and engineering features of A bid section construction project of Shanghai urban traffic line 17.risk identification and evaluation of A bid section construction project of Shanghai urban rail transit line 17 in Shanghai city.Using the basic process and method of engineering project risk analysis,the risk of construction project of A section of Shanghai urban rail transit line 17 is identified.By using AHP and fuzzy comprehensive evaluation method to build a risk index system and weight analysis of Shanghai city rail transit line 17 A section of construction project,and risk assessment of Shanghai city rail transit line 17 A section of construction project.on the basis of city rail transportation risk management analysis,from the policy risk,economic risk,technology risk,organization and management risk,construction risk,put forward risk response and control of Shanghai city rail transit line 17 section A project strategy six aspects of risk resistance.Through the analysis and discussion of the risk management process of Shanghai Shen Tong MTR group in Shanghai metro line 17 A section of the construction project,summarize lessons learned can be beneficial,bring reflection and inspiration for Shanghai rail transit line construction,the construction of new and better guide,and has a certain reference value for other large-scale city the rail traffic construction project risk management,other construction projects can be used for reference. |