With the in-depth development of the structural reform of the supply side of the country,the emphasis on the construction of ecological civilization and the promotion of the transformation of old and new kinetic energy has only one purpose,which is to promote the transformation and upgrading of the country’s industrial structure and achieve high-quality economic development.This situation is both a challenge and an opportunity for the coal coking industry.Shandong Tiexiong Xinsha Energy Co.,Ltd.(referred to as Shandong Tiexiong Company in the text)as a typical coal coking industry,in the face of fierce market competition,ensuring stable production is the first task,the premise of production is the normal operation of equipment,which is not The effective management and control of spare parts is carried out,so the classification management and control of spare parts occupy an important position in the company’s business activities.It is an important issue to use scientific management methods to improve the management level of spare parts.In this paper,Shandong Tiexiong Co.,Ltd.is the research object,and conducts in-depth research on the existing inventory control and control status of the company to improve the scientific management of spare parts management,reduce the amount of spare parts inventory funds and spare parts consumption,and combine the actual situation of the company.An optimized plan for the management and control of inventory spare parts has been formulated,which is conducive to improving the management level of the company’s spare parts and increasing the company’s efficiency.The article first introduces the relevant theoretical knowledge of spare parts control and the production characteristics of the coking industry,and then through the field research and related data acquisition of the company,the existing status and problems of the inventory control of Shandong Tiexiong Company are brought out,and conduct problem analysis,and finally propose a classification model and management strategy,and supplement the specific measures to ensure the implementation of the program.In the formulation of the optimization plan,it is divided into three aspects:target layer,solution layer and measure layer.With the goal of reducing the amount of inventory funds and spare parts consumption,the optimization plan is formulated from the aspects of classification management and control strategy of spare parts,among which classification The management and control combines AHP analytic hierarchy process and ABC classification management model to classify,design and formulate spare parts more comprehensively.The management strategy is elaborated from three aspects:classification procurement model,spare parts consumption forecasting inventory quota,and spare parts total quality management.In order to ensure the smooth promotion of the optimization program,combined with the existing organizational structure and management model of Shandong Tiexiong Company,specific measures were proposed from the aspects of management system,management process and organizational structure to promote the effective implementation of the program.Through the research on the management and control scheme of the inventory spare parts of Shandong Tiexiong Company,it will reduce the company’s inventory capital occupation to a certain extent,reduce equipment consumption and save production costs,which is in line with the company’s development ideas of energy saving,potential utilization and efficiency improvement.In addition,due to the inherent production characteristics of the coking industry,the operation of the equipment and the types of spare parts are similar,and it also serves as a reference for similar coking companies and can be promoted in the industry. |