| With the increasing number of public infrastructure PPP projects in China,many problems have been exposed in the process of government supervision.For example,the government’s supervision is not comprehensive enough and the supervision organization system is not perfect enough.This not only reduces the regulatory efficiency of the government,but also leads to the inefficiency of project progress.All these problems in the government regulation may reduce the government’s investment income and make it difficult to achieve results,affecting the public interest.BY county household waste incineration power generation PPP project is a part of BY county"263" environmental special rectification action,which not only achieves the classification and governance of household waste in the implementation,but also makes BY county’s urban and rural garbage centralized harmless disposal of people’s livelihood has been thoroughly solved.Government departments in living garbage incineration power generation of the PPP project supervision BY county also appeared in the process of the above,such as the lack of laws and regulations and supervision based on low level,imperfect regulatory system,regulatory content few and narrow range,in this context,how to study in the heart of the PPP mode BY county living garbage incineration power generation project of government supervision work done is the most concern.Based on the theory of public interest,the theory of capture,and the theory of government supervision,this paper conducts an in-depth study on this subject by using the methods of literature,field investigation,and case analysis.Firstly,the general situation and supervision status of BY county’s household waste incineration power generation PPP project are introduced.The supervision status quo is mainly introduced from the following five aspects:the basis of project supervision,the system of supervision,the content of supervision,the process of project supervision,and the way of project supervision.Secondly,it analyzes the existing problems and reasons in the supervision of BY county’s household waste incineration power generation PPP project.The problems mainly include the absence of laws and regulations and the low level of supervision basis,the imperfect supervision system,the lack of supervision content and narrow scope,the lack of follow-up supervision in the whole process of the project,and the single and rigid supervision mode.The reasons mainly include insufficient understanding and attention,inadequate organization,weak supervision,lack of supervision performance evaluation,and lagging supervision informatization,etc.Finally,in view of the existing problems,the paper puts forward the countermeasures to improve the supervision of BY county household waste incineration power generation PPP project.Mainly from the formulation and improvement of government supervision laws and regulations and policy system;To improve and perfect the multi-level supervision system;To refine and expand the content and scope of supervision;Implement the whole process and on-site dynamic supervision;Innovating regulatory means and methods;Strengthening the supervision team construction and other six aspects were elaborated.The research of this paper can further improve the supervision of BY county’s household waste incineration power generation PPP project,and provide practical reference and successful model for other public infrastructure industries to implement the PPP model,so as to promote the effective supply and efficient operation of China’s public goods and improve people’s quality of life and happiness. |