Font Size: a A A

Research On Target Cost Control Of RX Real Estate Company Z Project

Posted on:2021-04-29Degree:MasterType:Thesis
Country:ChinaCandidate:X HanFull Text:PDF
GTID:2439330611496699Subject:Accounting
Abstract/Summary:
In recent years,the state’s macro-regulation policies on the real estate industry have become more and more,and it is becoming increasingly difficult for RX real estate companies to ensure the realization of their target profits,and the pressure is increasing.The current cost management model of the Z project is too high to achieve the target profit of the Z project.Therefore,the current cost management model of the Z project is unreasonable.In fact,the actual cost calculated under this system is lower than the actual cost under the current cost management mode of the Z project,which proves that the target cost management system is of practical significance.Based on target cost management,this paper builds a target cost management plan for RX Real Estate Company Z project and proves that the plan is optimized by comparison.The first part of this article introduces the current research status at home and abroad,the second part introduces the related research on the target cost management of real estate development projects,the third part describes the current status of the cost management model of the Z project and the existing problems,and then the fourth part is for Z The project establishes and implements a target cost management plan.The plan has four steps: first determine the target cost,then decompose the target cost according to the contract,then each responsible department controls each sub-target cost,and finally compares the dynamic cost with the target.Cost to further control and adjust dynamic costs,and then apply the target cost management plan to the Z project,and compare the adjusted dynamic costs obtained under the implementation of this plan with the actual cost management model of the Z project to prove The scheme is meaningful and optimized.The last part of this article,the fifth part,tells the related conclusions and the shortcomings of this article.
Keywords/Search Tags:Real estate development project, Target cost management, cost control, dynamic cost
Related items