Researchof C-Type Tank Project Cycle Optimization Management

Posted on:2019-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:J DuanFull Text:PDF
GTID:2439330590991879Subject:Project management
Abstract/Summary:PDF Full Text Request
Since 2015,as the U.S.shale oil production increase,the country got rid of import thoroughly,and the Middle East,Russia and other geopolitical factors,such as in global oil prices all the way down,and at the low end in the long run.A drop in oil prices to the Marine engineering equipment manufacturing industry have a huge impact,owner abandon single phenomenon common occurance,industry faced the crisis of excess production capacity,a large number of Marine engineering enterprises are facing collapse or bankruptcy reorganization.Liquefied gas ship market has been fatigue and still does not see the bottom.Under the background of the overall downturn in the market of the gas carrier,the customer want to complete the project in the shortest time,put into operation as soon as possible,in order to achieve the goal of recovery costs and profits.Therefore,short project cycle become customer focus on appeal.Who can give priority to meet customer demand,can seize market share,to create conditions for enterprise survival.Also in the same industry at home and abroad customers to be a period of 6 months to complete the project contract to the final delivery of the actual case,compare the company S past tank construction cycle of the project,with customer demand is still a big gap.Under the background of the current industry,Marine project construction market is highly efficient and flexible response to the fast rhythm of the necessary factors,optimization of the project cycle has already become one of the key factors of competitiveness.This paper adopts the TOC constraint theory,Supply Chain Management analysis,CPM critical path method for tank three major part of the project cycle,namely,design,procurement,construction of three cycle compression plate.Through the tank cycle optimization,for project preparation stage and production stage of the process is optimized,and process seamlessly,to straighten out the whole tank design,procurement and production process of the project,and finally determine the tank the shortest cycle of the project.Tank cycle optimization not only good for the company to help enterprises have more clear understanding of the internal production capacity,to improve the ability of foreign orders,but also,the tank internal compression cycle is helpful to the production department more reasonable arrange production,improve production efficiency.
Keywords/Search Tags:Cycle optimization, C type tank, Ship building, Project schedule
PDF Full Text Request
Related items