Font Size: a A A

Study On Improvement Countermeasure For Equipment Management System Of ZTC Vehicle Company

Posted on:2020-10-23Degree:MasterType:Thesis
Country:ChinaCandidate:X L LiuFull Text:PDF
GTID:2439330575969888Subject:Business Administration
Abstract/Summary:PDF Full Text Request
ZTC vehicle company is a high-speed railway production enterprise affiliated to CRRC.It has produced the first steam locomotive,“Rocket of China”,and the first 350 KM high-speed EMU in China.The R&D and production capacity of high-speed rail has reached the leading domestic and internationally renowned level.In the future,the company will continue to consolidate the core business of the mature manufacturing and maintenance of motor vehicles and urban rail vehicles,and seek new revenue growth points in the integration of rail transit New material energy saving and environmental protection industry.In the past few years,the company has also increased the investment in fixed assets while a large number of equipment have brought productivity and productivity enhancements to the company,but also brought many problems to equipment management.Although as the equipment management department,we have consciously tried many times to solve the equipment problems.However,in recent years,what has been basically done is a partial improvement.It is difficult to fundamentally change the stubbornness accumulated in the past.In the past,equipment management systems have become more and more difficult to adapt to the company's future international development.Equipment management is one of the main management tasks of ZTC vehicle company Only by exploring a device management system suitable for the future development of the enterprise can the equipment management work be continuously improved,the rate of use of the equipment can be guaranteed,and in order to enable the equipment to be safely and reliably produced continuously,the economic benefits of the equipment can be improved,so that the company can The fierce market competition at home and abroad is in an invincible position.It is very necessary to find a scientific and reasonable equipment management system improvement program.Freezing three feet is not a day's cold.If we want to improve the overall equipment management of the company,we must innovate in management,and use advanced management means to improve the equipment management system in an all-round way.How to realize the overall improvement of equipment management system of ZTC vehicle company how to guarantee the implementation of these improvement schemes have become a topic worthy of our attention and research.Based on the basic situation of ZTC vehicle company,this paper summarizes the existing problems under the current company's equipment management system,and analyses and classifies these problems.Improve planning,execution,inspection and feedback system.At the same time,by introducing modern equipment management methods and putting forward safeguard measures as support,the ultimate goal is to enable the countermeasure to land and truly improve the overall equipment management level of ZTC vehicle company.This research further deepens our understanding of equipment management in a theoretical sense.Through the research of this subject,it can provide scientific theoretical guidance for the company's equipment management work,thereby improving the company's equipment management function,and ultimately improving the company's management level and decision-making level.In the practical sense,it can improve the company's equipment utilization rate,improve the self-protection ability,reduce the fault repair rate,reduce the equipment spare parts inventory,reduce the fault repair time,save the production cost for the company,enhance the product competitiveness and make the company's equipment achieve high investment.Return.It has important practical significance to ensure the normal production operation of the company.
Keywords/Search Tags:ZTC vehicle company, Equipment management system, Improvement countermeasure, Safeguard measures, Modern Equipment Management Method
PDF Full Text Request
Related items