Research On Schedule Management Of QH Mobile Traffic Sharing Platform Construction Project

Posted on:2018-03-11Degree:MasterType:Thesis
Country:ChinaCandidate:X HanFull Text:PDF
GTID:2429330566999540Subject:Project management
Abstract/Summary:PDF Full Text Request
Abundant flow of business era of customer demand connotation,the existing mode of traffic management has been difficult to adapt to the needs of users of the Internet era of diversity,bring a series of new problems in the system support,business development,business operation,business innovation,operators are facing various challenges.According to the three curves of the group's proposed strategy,to promote the transition of the flow of business of the Internet,continue to improve and perfect the traffic management ability,to expand the flow for new mode of operation,to achieve traffic donation,centralized payment,recharge,wholesale,distribution,envelopes and other functions.Therefore,you need to start the flow of red sharing platform construction project.To meet the traffic operation of the Internet era.In this paper,the technology and method of project schedule management are applied to the progress management of the construction project of the flow sharing platform,and the characteristics of this project schedule management process are analyzed.Finally,a project schedule management form and a set of system project schedule control form are obtained.Set up efficient project management team,establish human,machine and material deployment and communication system,as well as procurement of material support,engineering quality assurance and other institutional measures.It ensures that the team can establish correct goals,and forms a mutual incentive and cooperation work environment and work atmosphere,which provides guarantee for solving the problems of quality,safety,schedule,cost and so on.In the project operation,constantly adjust and control according to the work speed at that time.At the right time,it is very important to the inspection and supervision methods production schedule,quickly find loopholes,the project group quickly rectification,make the project in accordance with the optimized plan is completed,planning,implementation,inspection and summary throughout the project practice,is the prerequisite and guarantee for the effective control of the project schedule.
Keywords/Search Tags:Traffic sharing system, Platform construction, Schedule management
PDF Full Text Request
Related items