Font Size: a A A

Application Of The Quality Management In Sri Lanka Power Transmission Project

Posted on:2019-07-22Degree:MasterType:Thesis
Country:ChinaCandidate:L X ZhangFull Text:PDF
GTID:2429330566485681Subject:Engineering
Abstract/Summary:PDF Full Text Request
The electric power industry as one of the pillar industry of national economy,which plays an important role in promoting the healthy development of the national economy.With the development of Chinese economics and power industry,a large number of power project investment in the construction of substation project but having capital intensive,technology intensive,resource intensive,cross construction,involved in the project early,address exploration,preliminary design,construction design,construction,and commissioning of multiple stages and many stakeholders,in the construction process will be affected by external factors,which affect the quality of the project.Project quality directly affects the operation of the project Safety,economy and reliability,not only related to the safe operation of major equipment in power grid environment,but also related to the operator of each link grid safety.Therefore,research on the quality management plan has a very important significance for theoretical research and practical needs of the power transmission project construction project.Based on this,the Sri Lanka thermal power station power transmission project as the research object,puts forward a comprehensive evaluation of the overall quality management of AHP and fuzzy comprehensive evaluation method based on the combination of methods,it firstly analyzes the domestic and foreign research on the theory and method of comprehensive quality management,analysis power transmission project quality management content and management situation of Sri Lanka thermal power transmission project,in full consideration of the impact and the quality of the construction project,the establishment of a comprehensive evaluation of power quality management system,then use AHP to determine the comprehensive construction of power transmission project The weight of quality indicators,and using the fuzzy comprehensive evaluation model to evaluate the research of Sri Lanka thermal power station power transmission project quality management.Finally,combined with the actual situation,proposed the existing substation in quality management problems and puts forward corresponding suggestions.We hope that through this study,provide a reference in order to improve the quality management of domestic substation project.
Keywords/Search Tags:power transmission and transformation, quality management, analytic hierarchy process(AHP), fuzzy comprehensive evaluation
PDF Full Text Request
Related items