Research On Performance Management Of Resettlement Housing Construction Project In Rui Yang District

Posted on:2018-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:F LiuFull Text:PDF
GTID:2429330563459332Subject:Engineering / Project Management
Abstract/Summary:PDF Full Text Request
In recent years,the economic development of the central city of Longyan to a new level,the appearance of the city has greatly improved,continuous improvement of infrastructure,all these achievements all cannot do without levy resettlement work.Properly solve the resettlement problem is the key to the smooth progress of the project.But due to the placement of the housing construction in the process of resettlement houses without a unified management,resettlement approval procedures lag,resettlement housing construction site planning,construction procedures are not scientific and other aspects of the problem,caused by the placement of the housing construction progress is slow,this situation caused by the owners of a single pay for the transition costs a lot of waste a lot of countries capital.Longyan city land reserve center as the central city of Longyan most of the resettlement housing project owners units,a large number of resettlement housing construction projects were commissioned by the city housing company,city land development group construction company and other units on behalf of the construction.In recent years,along with the reason of daijiandanwei growing staff,internal departments,institutions change of performance management is not in place,brought great impact to the city center of the resettlement housing construction work,resulting in a few years the central city of Longyan resettlement housing construction work to promote slow.This will be small Rui Yang resettlement housing construction project as a case,through in-depth investigation and research the construction unit of Longyan city land development and construction company in detail,the performance management system construction by using the method of project management and process of research projects,including the research on the specific situation of the project and the project management status,needs and goals,and designing a closure project characteristics of the performance management system.In this paper,the research steps are: firstly,put forward the relevant theoretical basis,including the theory and method of performance management,project management theory;secondly,in-depth analysis of the basic situation of zuiyo residential resettlement housing construction projects and the construction unit of the status of human resources;the third step,the analysis of the current situation and problems of performance management and the reason of Ruiyang District resettlement housing construction project construction unit;the fourth step,based on the above analysis,from the actual situation,combined with the features of the project,the application method of performance management,put forward Rui Yang District resettlement housing construction project performance management countermeasures.Based on the study of zuiyo residential resettlement housing construction project performance management system,can speed up the resettlement housing project construction progress in the protection of resettlement housing construction quality,and save a lot of resettlement housing construction costs and transition costs,provide the reference for the construction of resettlement housing unit owners of resettlement housing on behalf of the performance management of construction projects.
Keywords/Search Tags:Resettlement housing construction project management, Performance management system, Performance management system implementation, Fuzzy comprehensive evaluation method, AHP
PDF Full Text Request
Related items