Font Size: a A A

Research On Post-evaluation Of Municipal Road Reconstruction Project

Posted on:2021-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:S N ChenFull Text:PDF
GTID:2392330632955243Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Project post-evaluation is usually a post-evaluation of a project that has been completed and put into use for 1-2 years.It uses scientific and reasonable means to analyze and evaluate the preliminary decision-making,implementation process,benefit impact,and sustainable impact of the project.Comparing the expectations before the project construction,looking for gaps,and analyzing and feeding back the evaluation results obtained,not only can improve the management model,sum up experience and lessons,but also can carry out well-founded repairs to existing projects and provide experience support for projects under construction.With the development of the city's economy and the increase in people's needs,the reconstruction of municipal roads has been put on the agenda,and each city is continuing to carry out the reconstruction of urban roads,that is,to evaluate the success of urban development and reconstruction after the implementation of municipal road reconstruction projects It has important meaning.Based on the theory of post-project evaluation,this paper first conducts research on the post-evaluation work of domestic and foreign projects,and finds that there are still many post-evaluations on new municipal roads at home and abroad,and post-evaluation for municipal road renovation projects can be said to be rare less.This paper analyzes the related concepts and characteristics of the project post-evaluation and municipal road reconstruction project,and establishes a post-project evaluation system suitable for municipal road reconstruction project.Combining the characteristics of the evaluation object,selects the combined evaluation method,namely AHP+DEMATEL+ fuzzy The comprehensive evaluation method is used to establish a model and combine the actual municipal road reconstruction project to apply the model.Through accurate calculation and analysis,the final result of the road reconstruction is a success,and the results obtained are consistent with the actual situation,indicating that the evaluation model can be applied to the actual project evaluation to a certain extent,for the subsequent evaluation of similar road reconstruction projects.Provides reference significance and valuable experience.
Keywords/Search Tags:municipal roads, post-project evaluation, road reconstruction
PDF Full Text Request
Related items