Font Size: a A A

Study On Key Points Of Consultation And Review On Freeway Electromechanical System

Posted on:2020-03-19Degree:MasterType:Thesis
Country:ChinaCandidate:X Z LinFull Text:PDF
GTID:2392330626456825Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
With the gradual implementation of China's National Highway network planning(2013-2030),the continuous rapid construction of highways and the continuous development of information technology,the electromechanical system of highway plays an important role as the main means to improve the information management level and service level of highway.The highway electromechanical system is a technology-intensive system engineering.It integrates a variety of information technologies,including electronic communication technology,computer technology,automation control technology,mechanical engineering technology,In the process of highway construction and development,the three major systems of monitoring,charging,and communication are carried out simultaneously and coordinated development.How to do a good job of consulting and reviewing highway electromechanical engineering in the early stage to improve the design quality has become a major problem in highway electromechanical engineering.At the stage of design review of construction drawings,we should conduct more detailed reviews.We will focus on the areas where sub-systems are prone to problems and correct them,taking into account the guidance and operability of the design documents,ensure that the design reaches the appropriate depth and level through consultation and review,and ensure the smooth implementation of electromechanical engineering projects during the construction phase.In this paper,the function and structure of the existing highway electromechanical system in Qinghai Province are analyzed and introduced in detail.In view of the problems existing in the existing highway electromechanical systems,the needs analysis and optimization goals of various specialties in the electromechanical systems are put forward.Through the projects in recent years,the consultation and review points of the expressway electromechanical engineering are summarized,and the optimization and improvement are continuously improved.In order to optimize the highway electromechanical system in the future consultation and review work.Finally,the paper proves the feasibility and validity of the key points of the study.It provides the basis for the consultation and review of other highway projects in the future,and can provide new ideas for the optimization management of the facilities of the electromechanical system in the later period.
Keywords/Search Tags:highway in Qinghai province, electromechanical system, design optimization, consulting review
PDF Full Text Request
Related items